![]() ![]() ![]() Upon receiving Chilled Water Pump Sets, the Site Engineer (HVAC) must ensure that all units, dampers, and air outlets received at the site are free of any damage or deformity of any kind.Īny minor damages observed will be repaired suitably, and if repairing perfectly is not possible, it will be sent to the supplier for rectification.įurnish extra materials that match products installed, are packaged with protective covering for storage, and are identified with labels describing contents.All Air handling units, Fan coil units, Dampers, Silencers, Grills, Diffusers, Registers, and Louvers will be delivered in manufacturers’ original protective packaging.